Renewable energy installations in Limerick
Home

Co. Limerick · Munster

Solar, Heat Pumps & EV Chargers in Limerick

Solar PV, battery storage, heat pumps and EV chargers installed across Limerick city and county. Our local team handles everything from roof survey to ESB grid connection — and helps you claim every SEAI grant you're entitled to.

Areas we cover

Installing across Co. Limerick

Limerick city (Castletroy, Annacotty, Raheen, Dooradoyle, Corbally), the county (Adare, Newcastle West, Kilmallock, Abbeyfeale, Rathkeale) and out into east Clare and north Tipperary.

  • Limerick City
  • Castletroy
  • Raheen
  • Annacotty
  • Adare
  • Newcastle West
  • Kilmallock

Local data

Solar & energy in Limerick — by the numbers

1,472

Sun hours / year

3,400+ kWh

Typical 4kW yield

€1,795

Avg annual bill

110+

Homes installed

A 4kW system in Limerick typically generates 3,400–3,800 kWh per year.

Customer story

The Ryan family, Castletroy, Limerick

System installed

6kW solar + 10kWh battery + 7kW EV charger

First-year saving

€1,540 in the first 12 months

"The EV charges on solar most days from April onward. Diesel was costing us €280/month — that's gone."

Estimated figures only. Savings, payback, generation and running-cost numbers shown are indicative estimates, not guarantees. Actual results depend on your system size, roof orientation, shading, electricity tariff, self-consumption, grant eligibility, property condition and other factors. Contact us for a free survey and a fixed, tailored quote.

Frequently asked

Limerick solar & heat pump FAQ

Do UL / Castletroy estates suit solar panels?

Yes — most Castletroy, Annacotty and Monaleen estates were built 1990–2010 with strong roof pitches ideal for solar. We've done extensive work on Grove Island, Rivergrove and Milford estates.

Any planning permission issues in Limerick?

Rooftop solar is exempt from planning permission for detached and semi-detached homes throughout Limerick (post-2022 regulations). Only listed buildings and ACAs need consultation.

Can I combine solar with the Limerick City & County retrofit scheme?

Yes. The SEAI One Stop Shop grant stacks with local retrofit supports for pre-2011 homes. We handle both applications.

How quickly do you install in Limerick?

Survey within 5 working days, installation within 4–6 weeks of contract, grid connection sign-off 4–6 weeks after that.

Get your Limerick quote today

Free, no-obligation quote for your Limerick home — solar, battery, heat pump or EV charger.