Co. Limerick · Munster
Solar PV, battery storage, heat pumps and EV chargers installed across Limerick city and county. Our local team handles everything from roof survey to ESB grid connection — and helps you claim every SEAI grant you're entitled to.
Services in Limerick

Generate clean electricity from your roof and cut bills by up to 70%.
View Solar PV Systems in Limerick
Store excess solar and use it on the most expensive evening hours.
View Battery Storage in Limerick
7kW smart home chargers — SEAI grant up to €300.
View EV Chargers in Limerick
Up to 4× more efficient than gas or oil. Grants up to €6,500.
View Heat Pumps in Limerick
Automate heating, hot water and EV charging from one app.
View Smart Energy Controls in LimerickAreas we cover
Limerick city (Castletroy, Annacotty, Raheen, Dooradoyle, Corbally), the county (Adare, Newcastle West, Kilmallock, Abbeyfeale, Rathkeale) and out into east Clare and north Tipperary.
Local data
1,472
Sun hours / year
3,400+ kWh
Typical 4kW yield
€1,795
Avg annual bill
110+
Homes installed
A 4kW system in Limerick typically generates 3,400–3,800 kWh per year.
Customer story
System installed
6kW solar + 10kWh battery + 7kW EV charger
First-year saving
€1,540 in the first 12 months
"The EV charges on solar most days from April onward. Diesel was costing us €280/month — that's gone."
Estimated figures only. Savings, payback, generation and running-cost numbers shown are indicative estimates, not guarantees. Actual results depend on your system size, roof orientation, shading, electricity tariff, self-consumption, grant eligibility, property condition and other factors. Contact us for a free survey and a fixed, tailored quote.
Frequently asked
Yes — most Castletroy, Annacotty and Monaleen estates were built 1990–2010 with strong roof pitches ideal for solar. We've done extensive work on Grove Island, Rivergrove and Milford estates.
Rooftop solar is exempt from planning permission for detached and semi-detached homes throughout Limerick (post-2022 regulations). Only listed buildings and ACAs need consultation.
Yes. The SEAI One Stop Shop grant stacks with local retrofit supports for pre-2011 homes. We handle both applications.
Survey within 5 working days, installation within 4–6 weeks of contract, grid connection sign-off 4–6 weeks after that.
Free, no-obligation quote for your Limerick home — solar, battery, heat pump or EV charger.