
Solar PV · Dublin
Future Energy installs SEAI-registered solar PV systems across Dublin — from Rathmines terraces to Malahide detached homes. Free roof survey, grant paperwork and ESB Networks notification included.
Dublin has the highest electricity prices in Ireland and a huge mix of south-facing rooftops. A 4 kW system on a typical 3-bed semi cuts annual bills by €900–€1,100 and pays back in 6–8 years. With battery storage you cover evening peak usage from solar generated during the day — critical when ESB unit rates spike between 5pm and 7pm.
We cover all four Dublin local authorities: Dublin City (Rathmines, Drumcondra, Phibsboro, Inchicore), Fingal (Swords, Malahide, Howth, Balbriggan), South Dublin (Tallaght, Lucan, Clondalkin) and Dún Laoghaire-Rathdown (Dundrum, Blackrock, Stillorgan). Every quote includes a free roof survey, shading analysis and grant eligibility check.
Homes built and occupied before end-2021 qualify for the €1,800 SEAI Solar PV grant. We handle the application, contractor declaration and BER assessment booking — you get the grant deducted directly from your invoice. Apartment owners with sole roof rights and management company sign-off can also qualify.
Pricing
| Option | From | After grant | Notes |
|---|---|---|---|
| 2 kW · apartment / small terrace | Quote | €1,800 grant | 4–5 panels |
| 4 kW · 3-bed semi | Quote | €1,800 grant | 8–10 panels |
| 6 kW · 4-bed detached | Quote | €1,800 grant | 12–14 panels |
| 6 kW + 5 kWh battery | Quote | €1,800 grant | Covers evening peak |
Prices depend on roof type, access, inverter choice and whether you add a battery. We provide a fixed quote after a free survey — no hidden extras.
Estimated figures only. Savings, payback, generation and running-cost numbers shown are indicative estimates, not guarantees. Actual results depend on your system size, roof orientation, shading, electricity tariff, self-consumption, grant eligibility, property condition and other factors. Contact us for a free survey and a fixed, tailored quote.
Why Future Energy
Local install teams covering all 4 Dublin local authorities — usually on site within 3–4 weeks.
Fully SEAI-registered contractor — €1,800 grant deducted at source, no rebate paperwork.
We file the NC6 / NC7 notification with ESB so your system can legally export.
JA Solar / Longi panels, Sungrow or SolarEdge hybrid inverters, 12-year product warranty.
Hybrid inverter installed by default — add battery storage now or later.
€6.5m public liability, RECI registered electrician on every job.
FAQ
Every roof is different, so we quote each job individually after a free survey. A typical 4 kW Dublin semi falls in the mid-range, with the €1,800 SEAI grant deducted at source for eligible homes. Contact us for a fixed quote.
Yes. Dublin averages around 1,100–1,300 kWh per kWp installed each year. Modern panels generate well in diffuse light, so a 4 kW system still produces ~3,600 kWh/year — enough for most of a family home's daytime use.
For most houses no — solar PV is exempt under SI 235/2022 (no panel area cap on roofs). Protected structures and some apartments still need approval. We check this for every Dublin survey.
1–2 days on site for a typical Dublin semi-D. Scaffolding goes up the day before. We handle SEAI grant paperwork and ESB Networks NC6 notification for you.
Tell us your address — we'll do a satellite shading check before we even visit.